Trencher work at Riva Ridge
Trencher work at Riva Ridge
Highway 183A Construction Project - 2006   Page 11
High Gabriel Water
Supply Corporation
Highway 183A Construction Project - 2006

The trenching machine was used to cut a trench 24 inches wide, three to eight feet deep and 1500 feet long in almost solid rock along the east side of 183A.