|
|
Trencher cuts under the existing water line
|
Highway 183A Construction Project - 2006 Page 14
|
|
High Gabriel Water Supply Corporation
|
Highway 183A Construction Project - 2006
|
The trenching machine's blade moves alarmingly close to the active Riva Ridge water line. Fortunately, the trenching machine operator can precisely control the location of the cutting blade.
|
|
|
|