|
|
Trench looking north
|
Highway 183A Construction Project - 2006 Page 19
|
|
High Gabriel Water Supply Corporation
|
Highway 183A Construction Project - 2006
|
The trench along the east side of 183A is approximately 1500 feet long, from Riva Ridge to South Gabriel Drive. About 2200 gallons of water will be needed just to fill the 6-inch diameter water line inside the trench.
|
|
|
|