High Gabriel Water Supply Corporation
Trench looking north
Trench looking north
Highway 183A Construction Project - 2006   Page 19
High Gabriel Water
Supply Corporation
Highway 183A Construction Project - 2006

The trench along the east side of 183A is approximately 1500 feet long, from Riva Ridge to South Gabriel Drive. About 2200 gallons of water will be needed just to fill the 6-inch diameter water line inside the trench.









High Gabriel Home Page
Previous Page Next Page