High Gabriel Water Supply Corporation
New 6-inch valve assembly and existing 4-inch line at South Gabriel Drive
New valve assembly and existing 4-inch line at South Gabriel Dr.
Highway 183A Construction Project - 2006   Page 29
High Gabriel Water
Supply Corporation
Highway 183A Construction Project - 2006

Merv Lind inspects the underground valve assembly that will be used to control the flow of water south to Riva Ridge and east along South Gabriel Drive. The existing 4-inch HGWSC water line passes directly over the new valves.








High Gabriel Home Page
Previous Page Next Page