|
|
New valve assembly and existing 4-inch line at South Gabriel Dr.
|
Highway 183A Construction Project - 2006 Page 29
|
|
High Gabriel Water Supply Corporation
|
Highway 183A Construction Project - 2006
|
Merv Lind inspects the underground valve assembly that will be used to control the flow of water south to Riva Ridge and east along South Gabriel Drive. The existing 4-inch HGWSC water line passes directly over the new valves.
|
|
|
|