High Gabriel Water Supply Corporation
Making the cut
Making the cut
Highway 183A Construction Project - 2006   Page 33
High Gabriel Water
Supply Corporation
Highway 183A Construction Project - 2006

Terry Tuttle cuts into the existing 4-inch line that carries water along South Gabriel Drive. The line will be "nudged" over into the center of the trench where it will be connected to the new 6-inch line.









High Gabriel Home Page
Previous Page Next Page