|
|
Making the cut
|
Highway 183A Construction Project - 2006 Page 33
|
|
High Gabriel Water Supply Corporation
|
Highway 183A Construction Project - 2006
|
Terry Tuttle cuts into the existing 4-inch line that carries water along South Gabriel Drive. The line will be "nudged" over into the center of the trench where it will be connected to the new 6-inch line.
|
|
|
|