High Gabriel Water Supply Corporation
Preparing for the final connection
Preparing for the final connection
Highway 183A Construction Project - 2006   Page 34
High Gabriel Water
Supply Corporation
Highway 183A Construction Project - 2006

Terry Tuttle and Merv Lind move the existing 4-inch water line into position for connection to the new 6-inch line.










High Gabriel Home Page
Previous Page Next Page