|
|
Preparing for the final connection
|
Highway 183A Construction Project - 2006 Page 34
|
|
High Gabriel Water Supply Corporation
|
Highway 183A Construction Project - 2006
|
Terry Tuttle and Merv Lind move the existing 4-inch water line into position for connection to the new 6-inch line.
|
|
|
|